I per square foot in the estimate now submitted.

To summarize the matter, the proposed scheme now will give a supply of over half a million gallons per day, which it is anticipated will be fully required within a few years after the works have been completed.

I therefore submit that the entire scheme be now undertaken, and that I be authorized to call for tenders for the contingent works, the estimated cost of which, including materials to be supplied by the Government, is $505,000. The balance of the estimated cost is absorbed by the mains, service reservoirs, &c., which will be let under separate contracts.

It is of great imperative that the works should be undertaken without delay and that the present dry season should be availed of to the greatest extent possible.

I have the honour to be,

Your obedient Servant,

W. Chatham,

Ag. Director of Public Works.

Edit History

2026-06-01 02:43:06 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
14. 15 54 478 I per square foot in the estimate now submitted. To summarize the matter, the proposed scheme now will give a supply of over half a million gallons per day, which it is anticipated will be fully required within a few years after the works have been completed. I therefore submit that the entire scheme be now undertaken, and that I be authorized to call for tenders for the contingent works, the estimated cost of which, including materials to be supplied by the Government, is $505,000. The balance of the estimated cost is absorbed by the mains, service reservoirs, &c., which will be let under separate contracts. It is of great imperative that the works should be undertaken without delay and that the present dry season should be availed of to the greatest extent possible. I have the honour to be, Your obedient Servant, W. Chatham, Ag. Director of Public Works.
Baseline (Original)
$ 14. 15 54 478 I per square foot in the estimate now subinitted. To summarize the matter, the proposed will give scheme now a over t1⁄2 million. supply of over gal loves per day, which it is acti cipated will be fully required ~ within a few years after the works. have been completed. I therefore submit that the entire scheme be now undertaken. and that I be authorized to call the dawn and cou- tenders for for tenders tingent works, the estimated cost of which, including materials to supplied by the spermaternis s $505,000. The balance of the esticuated "cout is absorbed by the mains, service, reservoirs, &c which will It is for cu ou separate contracts. imperative that the works should be undertaken without delay and that the present dry should be availed of extecct fonsible. to the Alasow greatest I have the liquour to be, Your Sir, W. gervant, Ag. Director of Public Works. f.
2026-06-01 02:43:06 · Baseline
View content

$

14.

15

54

478

I per square foot in the estimate

now subinitted.

To summarize the matter, the

proposed will give

scheme now

a

over t1⁄2 million.

supply of over

gal

loves per day, which it is acti cipated will be fully required ~ within a few years after the works. have been completed.

I therefore

submit that the entire

scheme be now undertaken. and that I be authorized to call the dawn and cou- tenders for for tenders

tingent works, the estimated cost of which, including materials to supplied by the spermaternis s $505,000. The balance of the esticuated "cout is absorbed by the mains, service, reservoirs, &c which will

It is for cu

ou separate contracts. imperative that the works should be undertaken without delay

and that the present dry should be availed of extecct fonsible.

to the

Alasow

greatest

I have the liquour to be,

Your

Sir,

W. gervant,

Ag. Director of Public Works.